BESCOM officials have emphasised that this temporary shutdown is vital for urgent infrastructure maintenance and substation repairs. These preventive measures are crucial for maintaining grid reliability, upgrading equipment, and reducing the risk of future power failures. The previous outage occurred on July 28, affecting the Puravankara Substation area, which included localities such as Halehalli and Maragondanahalli.